Background:
Heifer Project International Nepal (HPIN) is implementing a signature program “Milky Way- Transforming Dairy sector of Nepal”. Under the initiatives, there is a plan for establishing Model Dairy Village (MDV) cum Elite Nucleus Herd of dairy cattle with support of high-quality heifers (HF) from Heifer Korea. For dairy farming, adequate and regular supply of water for drinking to the animals; cleaning of shed, animals and dairy equipment; and irrigation of forage field are pre-requisite for success of dairy animal farming.
Therefore, HPIN is willing to conduct study to formulate technically sound and cost-effective water supply project in the MDV and seeking qualified consultant to undertake the study. The consultant is supposed to undertake, but not limited to the following broad scope of works:
- Scope of the Work:
The detailed scope of the work mostly includes, but not necessarily limited to the following:
- Review and upgrade the existing water supply system design up to reservoir tank (RVT), drawings and cost estimation.
- Assess existing water supply structures in terms of their reuse in case of rehabilitation of existing systems.
- Carry out detailed engineering and socio-economic survey, prepare checklist for environmental parameters of the project area.
- Verify the source yield, water quality, intake/sump well site, reservoir site, pipe alignment and number and location of house connection and other major structures.
- Clarify the community enthusiasm on the execution of the project and willingness to contribute for construction and undertake operation and maintenance responsibility upon commissioning.
- Prepare detailed water supply project report for the selected Sami Khahare Lifting Water Supply Project.
- Methodology:
The consultant shall submit proposal for the study explaining in brief their capacity and experience to undertake the job, methodology to be applied and cost required for detailed engineering study and design report for each project. The selection criteria of the consultant shall be based on technical & financial proposal; however, other relevant factors shall also be considered.
- Detailed Engineering Study and Design Report:
The detailed study report should be prepared highlighting all the listed issues and preferably include the site map marked on a district map. The report shall comprise four sections with major headings and sub-headings suggested below.
A) Project Summary
B) Abstract of Costs and Quantities
C) Drawings
D) Appendices
A) Project Summary
a. Salient features:
- Salient Features of Project
- Scheme-wise Salient Features
b. Project Costs:
- Summary of Project Costs
- Scheme-wise Costs.
- Operation and maintenance costs: sustainability analysis if required.
c. Introduction/Background Information/Brief Description:
- Project area: location, accessibility
- Physical features: topography, climate, vegetation etc.
- Socio-economic conditions: ethnic composition, gender distribution, occupation, educational and health services, socio-economic activities etc.
- Existing water supply situation: quantity, general quality, hardship
- Existing sanitary environment: general practices and conditions regarding personal, household and community hygiene and sanitation
d. Project Features/Details:
- Proposed scheme/s: number and name of scheme/s, type of system
- Proposed water source/s: yield, location, protection and conservation measures, water right guarantee
- Water quality: physical, chemical and microbiological qualities, remedies for quality improvement
- Technology adopted: discuss with justification, alternatives.
- Design criteria: give justifications if necessary.
- Population coverage
- Water Demand
- Components of the project
- Sanitation: methods to be adopted for sanitation promotion
- Physical, Social, Chemical, Cultural, Environmental consideration where applicable: impacts and mitigation measures
- Construction materials: availability and distances for transportation of local materials, nearest market and road head and distances involved for importation of materials.
- Remarks and conclusion
e. Annexes:
Annex-1 General information.
Annex-2 Exiting situation in the project area & Municipality.
Annex-3 Proposed water sources.
Annex-4 Household and population survey.
Annex-5 Existing public institutions in the project area.
Annex-6 Household and population projection.
Annex-7 Total water demand and water flow calculation.
Annex-8(A) Storage tank sizing (Continuous system)
Annex-8(B) Storage tank sizing (Intermittent system)
Annex-9 Hydraulic design of pipeline.
Annex-10 Layout plan.
Annex-11 Schematic flow diagram.
Annex-12 Water sample analysis report.
Annex-13 Financial Analysis and affordability.
Annex-14 Checklist for Environmental Parameters of the project area.
Annex-15 Name and persons contacted during survey.
Annex-16 Tracking of main structures and pipeline alignment in GPS.
Annex-17 Social map.
B) Abstract of Costs and Quantities:
a) Abstract of Costs and Quantities shall consist of
- Cost estimate
- Quantity estimate
- Rate analysis: basis for calculations.
C) Drawings:
The following drawings, complete and clear, should be submitted in the report:
a. Location Map – District map shall be used for the location map. The main
structures shall be located in contour map.
b. Layout Plan – The plan shall be drawn free of scale in separate sheet for each scheme and should give the following information:
- Name, type and safe yield of source.
- Location of intake, reservoir.
- Pipe lengths and relative elevation difference between the structures provided, such as intake, sedimentation tank, brake pressure tank, reservoir, distribution chambers, crossings, etc.
- Name of village/community, ward no.
- Prominent community buildings and institutions.
- Natural water bodies such as river, stream, lakes and ponds, if any.
- Major roads, highways.
c. Water Flow Diagram – The diagram should contain the following information:
- Pipe lengths and size, type and class of pipe used in each segment as per design.
- Water flow direction in each segment from intake to last point of distribution.
d. L-Section of pipeline – Longitudinal profile should be plotted for complete pumping, transmission and distribution pipelines with detail topographic elevations in a vertical scale of 1:1000 to 1:2000 and horizontal scale 1:5000 to 1:10000. It shall show the following:
- Static hydraulic line and hydraulic gradient line.
- Intake, reservoir, sedimentation tank, brake pressure and distribution chambers, air valves, washouts and taps.
- Elevation, total length, partial length, type of soil, discharge and size, type and class of pipe.
e. Drawings – Drawings of relevant civil structures in a scale as specified in Standard Drawings and Design Guidelines. Type designs shall be used as far as possible.
D) Appendices:
It shall contain the following documents:
- No source dispute guarantee from municipality.
- Approved district rates of materials and labors.
- Report Submission:
Reports shall be submitted to the HPIN office as follows:
- Inception report incorporating detail methodology of study and work plan within 1 week of signing of contract.
- One copy of the draft detailed project report should be submitted within 2 weeks from the date of agreement.
- Two copies of detailed engineering study and design final report with necessary amendments to incorporate comments and suggestions on the draft report should be submitted within a week after receiving the comments on draft report.
- Final reports should be computer printed on A4 size photocopy paper and photocopied with standard covers and binding. The cover sheet will include the name of HPIN, name of the project, RM/municipality with covered ward nos., name and address of consultancy firm and month and year of report submission.
- Qualification and requirements:
The consultant shall have at least bachelor’s degree in engineering (specialized in water supply system) at least 10 years of working experience in water system.
- Mode of Payment:
The HPIN shall pay the amount to the consultant as per agreement as stated below.
The amount shall be paid to the Consultant assigned for the study as follows:
- After submission of inception report – 25 percent of the total amount
- Upon submission and acceptance of
detailed engineering study and design final report – 75 percent of the total amount
Please submit the proposal to procurement-np@heifer.org by 26th May 2024, 5: 00 PM with email subject line “Proposal for conducting detailed engineering study and design of water supply project” along with below documents.
- Cover letter.
- Updated CV
- Brief Proposal with cost
- VAT /PAN Certificate
VAT registered vendors are encouraged to apply.